Return to
Home
Search
Contact +33 (0)185 086 581 Français

Dzoumogné

 

  • ContextFrench regulator Call for Tenders in islands and non-interconnected areas
  • Goalto control the local injected power to maximize the producer’s revenue
  • Project: PV (1,8 MWp) + Li-ion Battery (2 MW–2 MWh)
  • Statuscommissioned in 2016