
Monte Cinto is EDF Store & Forecast’s first EMS reference on a solar farm with storage in Corsica (France).
- Context: French regulator Call for Tenders in islands and non-interconnected areas
- Goal: to control the local injected power to maximize the producer’s revenue
- Project: PV (1 MWp) + Li-ion Battery (1 MW–1.8 MWh)
- Status: commissioned in October 2019
Read more about Monte Cinto project.