
- Context: French regulator Call for Tenders in islands and non-interconnected areas
- Goal: to control the local injected power to maximize the producer’s revenue
- Project: PV (5 MWp) + Li-ion Battery (2 MW–4 MWh)
- Status: commissioned in May 2015
Read more about Montjoly.