
- Context: A need for decarbonation, power autonomy and resilience with 100% of renewable power production contemplated in 2030
- Goal: to match the day-ahead scheduled production plan +/- 10% of installed PV power
- Project: PV (10.0 MWp) + Li-ion Battery (7.5 MW–7.5 MWh)
- Status: Inaugurated on 12 March 2019
Read more about Oua Tom